Tampa plans on size

Tampa Port has just completed the latest phase of its container terminal expansion. The terminal now includes 61 metres of berth length, three rail-mounted container gantry cranes and a 100-tonne mobile harbour crane, all on a 13 metre deep-water channel.

Tampa has completed expansion works

The next phase of expansion is already underway and includes a further extension of the container gantry crane rails and lengthening the berth to 853 metres, to be completed this summer.

Together with terminal operator Ports America, TPA has plans to quadruple the size of the terminal to over 160 acres over the next several years.

All news