{"id":4285,"date":"2015-10-15T17:01:00","date_gmt":"2015-10-15T16:01:00","guid":{"rendered":"https:\/\/portstrategy.nfdtesting.uk\/coastlink\/2015\/10\/15\/hulls-low-carbon-future\/"},"modified":"2026-08-27T15:38:47","modified_gmt":"2026-08-27T14:38:47","slug":"hulls-low-carbon-future","status":"publish","type":"post","link":"https:\/\/www.portstrategy.com\/coastlink\/2015\/10\/15\/hulls-low-carbon-future\/","title":{"rendered":"Hull\u2019s low-carbon future"},"content":{"rendered":"<p>The completed dredging campaign will not only allow construction of the UK\u2019s first ever offshore wind turbine manufacturing, assembly, installation and service facility, it will also allow deeper-drafted vessels to call at ports along the Humber Estuary.<\/p>\n<p>Simon Brett, ABP Head of Projects Humber, said: \u201cThis transformative project is already delivering real, tangible benefits to the city and the wider region. We\u2019ve already created jobs and many more will follow.\u201d<\/p>\n<p>Dredger Eke M\u00f6bius pumped one million cubic metres of material from the Estuary into the dock to infill one third of the water area during the project.<\/p>\n<p>ABP\u2019s project team and engineers working for main contractor the GRAHAM Lagan Construction Group Joint Venture (JV) have also stored sand for use during the seven-hectare reclaim for the new quay.<\/p>\n<p>The reclaimed area will be used to store wind turbine components prior to loading onto installation vessels.<\/p>\n<p>In spring 2016, the dredging of the new berth pockets will begin alongside marine piling for the new quay wall, which will feature berths for three windfarm installation vessels.<\/p>\n<p>Construction will also begin on a 60m east lead-in jetty to enable works on the 25,000-square metre site of Siemens\u2019 offshore service building.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>One year on the foundations for the Siemens development at ABPs Alexandra Dock in Hull have been laid providing what has been called a foundation for the UK\u2019s low-carbon future.<\/p>\n","protected":false},"author":8,"featured_media":4286,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[28],"tags":[],"sponsor":[],"class_list":["post-4285","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-projects-initiatives-greenport"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.portstrategy.com\/coastlink\/wp-json\/wp\/v2\/posts\/4285","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.portstrategy.com\/coastlink\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.portstrategy.com\/coastlink\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.portstrategy.com\/coastlink\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.portstrategy.com\/coastlink\/wp-json\/wp\/v2\/comments?post=4285"}],"version-history":[{"count":1,"href":"https:\/\/www.portstrategy.com\/coastlink\/wp-json\/wp\/v2\/posts\/4285\/revisions"}],"predecessor-version":[{"id":4287,"href":"https:\/\/www.portstrategy.com\/coastlink\/wp-json\/wp\/v2\/posts\/4285\/revisions\/4287"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.portstrategy.com\/coastlink\/wp-json\/wp\/v2\/media\/4286"}],"wp:attachment":[{"href":"https:\/\/www.portstrategy.com\/coastlink\/wp-json\/wp\/v2\/media?parent=4285"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.portstrategy.com\/coastlink\/wp-json\/wp\/v2\/categories?post=4285"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.portstrategy.com\/coastlink\/wp-json\/wp\/v2\/tags?post=4285"},{"taxonomy":"sponsor","embeddable":true,"href":"https:\/\/www.portstrategy.com\/coastlink\/wp-json\/wp\/v2\/sponsor?post=4285"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}