{"id":2552,"date":"2022-08-01T08:51:00","date_gmt":"2022-08-01T07:51:00","guid":{"rendered":"https:\/\/portstrategy.nfdtesting.uk\/greenport\/2022\/08\/01\/valencia-solar-plant-bids\/"},"modified":"2026-08-27T13:57:56","modified_gmt":"2026-08-27T12:57:56","slug":"valencia-solar-plant-bids","status":"publish","type":"post","link":"https:\/\/www.portstrategy.com\/greenport\/news\/energy-technology-greenport\/valencia-solar-plant-bids\/","title":{"rendered":"Valencia solar plant bids"},"content":{"rendered":"<p>The 6,420 sqm plant will be located between the Pr\u00edncipe Felipe dock and the Club N\u00e1utico de Val\u00e8ncia and will have an installed power of 1,464.5kWp of green energy.<\/p>\n<p>\u201cWe have an ambitious plan of a strategic nature, with specific objectives and applied to suit the different actors operating within the port, with real actions such as the commitment to the use of photovoltaic energy,\u201d said Aurelio Mart\u00ednez, president of the Port Authority of Valencia.<\/p>\n<p>This latest tender joins the plant in the Port of Gandia, already at bidding stage with a base budget of nearly \u20ac1.56 million. Another installation is also planned for the Valencia Terminal Europa vehicle warehouse building.<\/p>\n<p>\u201cThese projects are a sign of Valenciaport\u2019s firm commitment to decarbonisation, the reduction of dependence on fossil fuels and energy autonomy\u201d, said Mart\u00ednez.<\/p>\n<p>\u201cA plan with concrete measures is already under way such as the use of liquefied natural gas and hydrogen in port machinery, the construction of two electrical substations in the Port of Valencia or the location of various wind turbines for the production of wind energy,\u201d he added.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A contract to install the first photovoltaic plant in the Port of Valencia will be put out to tender.<\/p>\n","protected":false},"author":8,"featured_media":2553,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[46],"tags":[],"sponsor":[],"class_list":["post-2552","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy-technology-greenport"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/posts\/2552","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/comments?post=2552"}],"version-history":[{"count":1,"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/posts\/2552\/revisions"}],"predecessor-version":[{"id":2554,"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/posts\/2552\/revisions\/2554"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/media\/2553"}],"wp:attachment":[{"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/media?parent=2552"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/categories?post=2552"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/tags?post=2552"},{"taxonomy":"sponsor","embeddable":true,"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/sponsor?post=2552"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}