{"id":4525,"date":"2024-07-25T09:33:00","date_gmt":"2024-07-25T08:33:00","guid":{"rendered":"https:\/\/portstrategy.nfdtesting.uk\/greenport\/2024\/07\/25\/shore-power-planned-at-new-us-cruise-terminal\/"},"modified":"2026-08-27T14:11:08","modified_gmt":"2026-08-27T13:11:08","slug":"shore-power-planned-at-new-us-cruise-terminal","status":"publish","type":"post","link":"https:\/\/www.portstrategy.com\/greenport\/news\/americas-greenport\/shore-power-planned-at-new-us-cruise-terminal\/","title":{"rendered":"Shore power planned at new US cruise terminal"},"content":{"rendered":"<p>The port hopes to provide the shore power at the new Cruise Terminal 7 provided issues can be resolved with the state\u2019s largest energy utility, Florida Power &amp; Light. The large cruise vessels calling at the port use as much energy as the city itself meaning new substations may be required.<\/p>\n<p>\u201cIt is a complex equation for us,\u201d said Port Canaveral chief executive, Captain John Murray. \u201cWe are not opposed to it but we want to be smart about how we do it.\u201d<\/p>\n<p>The contract to construct the new terminal has been awarded to Miami firm, BEA Architects, who previously designed five of the port\u2019s six cruise terminals.<\/p>\n<p>If contract negotiations go smoothly, ground-breaking could take place as soon as January. \u201cWe\u2019re doing everything to advance the project as quickly as possible,\u201d said Murray.<\/p>\n<p>CT 7 will be a multi-user facility and will be sited on the existing North 8 Berth which shares a basin with CT 5 on the port\u2019s north side. The aim is to have the terminal up and running by late 2025 and to relocate MSC Cruises there.<\/p>\n<p>This spreading of terminals over different areas presents a further challenge for the installation of shore power. Channels for power lines will need to go through existing infrastructure, making electrification more complex than at the Port of Miami where the cruise terminals are in a row.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Port Canaveral in Florida, US is moving ahead with plans to create a new cruise terminal, the first to offer shore power.<\/p>\n","protected":false},"author":8,"featured_media":4526,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[33,75,46],"tags":[1719,573,1718,48],"sponsor":[],"class_list":["post-4525","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-americas-greenport","category-cruise-greenport","category-energy-technology-greenport","tag-bea-architects","tag-marine-civils","tag-port-canaveral","tag-shorepower-electrification"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/posts\/4525","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/comments?post=4525"}],"version-history":[{"count":1,"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/posts\/4525\/revisions"}],"predecessor-version":[{"id":4527,"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/posts\/4525\/revisions\/4527"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/media\/4526"}],"wp:attachment":[{"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/media?parent=4525"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/categories?post=4525"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/tags?post=4525"},{"taxonomy":"sponsor","embeddable":true,"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/sponsor?post=4525"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}