{"id":5671,"date":"2025-09-10T14:44:00","date_gmt":"2025-09-10T13:44:00","guid":{"rendered":"https:\/\/portstrategy.nfdtesting.uk\/greenport\/2025\/09\/10\/electric-propulsion-drives-green-danish-ferries\/"},"modified":"2026-08-27T14:18:24","modified_gmt":"2026-08-27T13:18:24","slug":"electric-propulsion-drives-green-danish-ferries","status":"publish","type":"post","link":"https:\/\/www.portstrategy.com\/greenport\/news\/energy-technology-greenport\/electric-propulsion-drives-green-danish-ferries\/","title":{"rendered":"Electric propulsion drives green Danish ferries"},"content":{"rendered":"<p>W\u00e4rtsil\u00e4 Corporation will supply the full electric propulsion package, including waterjets, for two battery-powered catamarans being built for Danish ferry operator Molslinjen at the Incat shipyard in Tasmania.<\/p>\n<p>\u201cOur partnership with Molslinjen and Incat not only brings electric vessels to the Kattegat route, but also continues our joint commitment in accelerating the industry\u2019s path towards net-zero emissions shipping,\u201d said Roger Holm, president of W\u00e4rtsil\u00e4 Marine &amp; executive vice president at W\u00e4rtsil\u00e4 Corporation.<\/p>\n<p><strong>Advanced propulsion<\/strong><\/p>\n<p>The advanced system will include eight electric propulsion motors, W\u00e4rtsil\u00e4\u2019s ProTouch propulsion control, DC power conversion and integrated energy management and automation technologies.<\/p>\n<p>This electric ferry project represents a milestone in vessel electrification, as the ferries will serve the busy Kattegat route while reducing vessel emissions by thousands of tonnes of CO\u2082 annually.<\/p>\n<p>Each ferry will measure 129 metres by 30.5 metres, capable of carrying 1,483 passengers and 500 cars, boosting Kattegat route capacity by over 25%.<\/p>\n<p>Stephen Casey, CEO of Incat Tasmania, emphasised the scalability of electric ferries for global markets.<\/p>\n<p>\u201cWe\u2019re not just building ships, we are building the future. Large-scale, low-emission transport solutions are not only possible, but are ready now.\u201d<\/p>\n<p>\u201dThe vessels address the market\u2019s needs and requirements by utilising batteries, making this a very viable option for owners and operators looking to increase the sustainability of their fleets.\u201d<\/p>\n<p>Deliveries are scheduled for 2027 and 2028.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Denmark is taking a major step toward zero emission shipping with the introduction of two new high-speed electric ferries.<\/p>\n","protected":false},"author":8,"featured_media":5672,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[46],"tags":[143,2274,2275,2273,2272],"sponsor":[],"class_list":["post-5671","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy-technology-greenport","tag-electric-ferries","tag-i","tag-incat-crowther","tag-wartsila-corporation","tag-zero-emission-shipping"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/posts\/5671","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/comments?post=5671"}],"version-history":[{"count":1,"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/posts\/5671\/revisions"}],"predecessor-version":[{"id":5673,"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/posts\/5671\/revisions\/5673"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/media\/5672"}],"wp:attachment":[{"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/media?parent=5671"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/categories?post=5671"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/tags?post=5671"},{"taxonomy":"sponsor","embeddable":true,"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/sponsor?post=5671"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}