{"id":6023,"date":"2026-02-05T14:07:00","date_gmt":"2026-02-05T14:07:00","guid":{"rendered":"https:\/\/portstrategy.nfdtesting.uk\/greenport\/2026\/02\/05\/exclusive-will-europes-ports-have-to-queue-for-grid\/"},"modified":"2026-08-27T14:20:33","modified_gmt":"2026-08-27T13:20:33","slug":"exclusive-will-europes-ports-have-to-queue-for-grid","status":"publish","type":"post","link":"https:\/\/www.portstrategy.com\/greenport\/news\/energy-technology-greenport\/exclusive-will-europes-ports-have-to-queue-for-grid\/","title":{"rendered":"EXCLUSIVE: Will Europe\u2019s ports have to queue for grid?"},"content":{"rendered":"<p>There is an urgent&nbsp;demand for sufficient grid capacity to face the quickly raising needs for electricity in ports.&nbsp;<\/p>\n<p>As we all know, all TEN-T ports having a minimum&nbsp;number&nbsp;of&nbsp;vessel&nbsp;calls have to be ready to offer onshore power supply to container,&nbsp;ferry&nbsp;and cruise vessels by 2030.<\/p>\n<p>This&nbsp;is&nbsp;in itself&nbsp;already multiplying the need for electricity in most&nbsp;ports by&nbsp;three or four times. But this is only one reason&nbsp;\u2013 be it a&nbsp;major&nbsp;one&nbsp;&#8211;&nbsp;&nbsp;ports&nbsp;will need access to&nbsp;additional&nbsp;grid capacity.&nbsp;<\/p>\n<p>The ongoing electrification of machinery and transport in and around the port, the progressing electrification of terminal operations, the electricity needs that will&nbsp;accompany the development of&nbsp;clean energy production in some of the ports and last but not least the overall increasing electricity needs of the industries and companies located in the port makes&nbsp;investments in&nbsp;and access to&nbsp;extra&nbsp;grid&nbsp;capacity&nbsp;&nbsp;urgent.<\/p>\n<p>Sufficient grid&nbsp;is key&nbsp;for port areas to be able to play their role in delivering the energy transition,&nbsp;complying with&nbsp;the EU legal obligations and&nbsp;&#8211;&nbsp;&nbsp;not less important &#8211;&nbsp;stepping up Europe\u2019s homegrown energy needs and as such Europe\u2019s energy resilience.&nbsp; &nbsp; &nbsp;&nbsp;<\/p>\n<p><strong>An EU package<\/strong><\/p>\n<p>That is also why all our attention has been going to the EU grids package which has been released on 10 December&nbsp;2025.<\/p>\n<p>The \u201cpackage\u201d consists of different elements, including a proposal to revise the TEN-E&nbsp;Regulation and a proposal to review the Directive to accelerate permit-granting procedures for&nbsp;energy&nbsp;infrastructure projects.&nbsp;<\/p>\n<p>The acceleration of permits is an interesting and quite ambitious&nbsp;proposal&nbsp;in its&nbsp;objectives. It looks at the&nbsp;different aspects&nbsp;of permitting, introduces tacit&nbsp;approval if no decision has been made within&nbsp;the given deadline, and from a&nbsp;ports&nbsp;perspective, says Member States should presume that&nbsp;Onshore&nbsp;Power&nbsp;Supply&nbsp;projects are of&nbsp;overriding public interest which&nbsp;automatically&nbsp;leads to easier permitting.<\/p>\n<p>This proposal still needs to&nbsp;be&nbsp;negotiated&nbsp;in the&nbsp;Parliament and&nbsp;Council&nbsp;and&nbsp;once agreed, Member&nbsp;States have two years to implement these principles. This means&nbsp;roughly speaking,&nbsp;that&nbsp;an&nbsp;enforcement&nbsp;of these rules will only be possible as from 2029. Considering that the OPS deployment in ports is due by 2030, ports will not be able to&nbsp;benefit&nbsp;from this faster track permitting for&nbsp;realising&nbsp;these investments.&nbsp;&nbsp;&nbsp;<\/p>\n<p>Next to&nbsp;the two legislative proposals and&nbsp;maybe one&nbsp;of the more important pillars of the package,&nbsp;is the Commission \u201cnotice\u201d giving \u201cguidance\u201d on efficient and&nbsp;timely&nbsp;grid connections.&nbsp;&nbsp;<\/p>\n<p>While&nbsp;this 29-pager is not legislative and cannot be enforced in its current status, it tackles one of the main issues ports are currently facing: The difficulty to get a timely connection to the electricity grid and the already existing delays in getting the connection, which might amongst others prevent certain OPS infrastructure&nbsp;or other important projects in ports&nbsp;to be used to its full potential&nbsp;in the near future.&nbsp;&nbsp;<\/p>\n<p><strong>Toolbox of measures<\/strong><\/p>\n<p>The guidance provides a toolbox of measures for&nbsp;Member&nbsp;States and all parties concerned to prevent,&nbsp;optimise&nbsp;and tackle lengthy connection queues. It&nbsp;aims to address the root&nbsp;causes of the problem, which are following the Commission\u2019s paper threefold.<\/p>\n<p>First, there is&nbsp;the inadequate&nbsp;planning. Building extra grid infrastructure takes 4 to 10 years&nbsp;whereas&nbsp;for the port to construct the connection to the grid, this&nbsp;can be done in&nbsp;2&nbsp;to 3 years. Given this&nbsp;mismatch&nbsp;it is important for grid&nbsp;operators, when deciding on network development,&nbsp;to look at future needs and forecasts instead of basing themselves on existing requests.&nbsp;If not, they will always come too late.&nbsp;<\/p>\n<p>A second problem&nbsp;seems to be&nbsp;the lack of transparency over where the grid connection would be&nbsp;feasible&nbsp;within the&nbsp;timeframe&nbsp;the market wants it for their&nbsp;connection&nbsp;&nbsp;as&nbsp;well as&nbsp;a lack of incentives to stimulate users towards areas where there is \u2013 or soon will be &#8211; sufficient grid capacity.&nbsp;These lead&nbsp;to requests being placed in already congested areas, which&nbsp;requires then&nbsp;greater investment and thus higher electricity system costs.<\/p>\n<p>The third&nbsp;identified&nbsp;driver of what is called the connection queue&nbsp;is the existence of speculative connection requests,&nbsp;non-maturing&nbsp;applications&nbsp;as well as the way the requests are being managed.&nbsp;Since so far \u201cfirst come, first serve\u201d is the main approach being taken by the grid providers, some applicants&nbsp;seem to reserve&nbsp;capacity&nbsp;at a very premature stage of the project&nbsp;which afterwards is not being&nbsp;materialised.&nbsp;These&nbsp;speculative requests can easily block&nbsp;the access&nbsp;for more&nbsp;viable&nbsp;requests coming&nbsp;later. For this reason,&nbsp;one of the recommendations of the Commission is for grid operators to get the mandate from the&nbsp;Regulators to work towards a \u201cfirst ready, first serve\u201d principle.<\/p>\n<p>Another way \u2013&nbsp;maybe&nbsp;still&nbsp;politically more difficult &#8211; to&nbsp;decide in case of scarcity of capacity is to introduce a priority&nbsp;scheme for certain users. Whereas the Electricity Directive obliges&nbsp;Member States and&nbsp;Regulatory&nbsp;Bodies to give non-discriminatory&nbsp;access to grids, it does not prevent the&nbsp;authorities to&nbsp;develop a framework that&nbsp;prioritises&nbsp;certain users&nbsp;as long as&nbsp;this is being done in a non-discriminatory and transparent way. Since the connection queue problem is quite recent,&nbsp;not many&nbsp;member states have been issuing such priority schemes&nbsp;yet.&nbsp;Netherlands is one of the only ones already&nbsp;testing this.&nbsp;&nbsp;<\/p>\n<p><strong>Will it work?<\/strong><\/p>\n<p>Will this EU grids package solve the problems ports are having?&nbsp;<\/p>\n<p>We should definitely&nbsp;be&nbsp;embracing&nbsp;the package&nbsp;since it puts quite successfully the finger on a series of problems that need to be tackled without further due. But it remains to be seen if the tools provided&nbsp;for in&nbsp;the guidance will be implemented by the Member States.<\/p>\n<p>The lack of mandatory framework or detail on the level of readiness expected in the application of the \u201cfirst ready first serve\u201d&nbsp;or the absence of common criteria for&nbsp;prioritisation&nbsp;might lead to a patchwork of systems and an unlevel playing field between member states&nbsp;<\/p>\n<p>In ESPO we are now assessing these proposals with our members and see where we could make suggestions for improvement or call for some&nbsp;additional&nbsp;initiatives.<\/p>\n<p>Ports&nbsp;and port areas&nbsp;being&nbsp;considered&nbsp;more and more&nbsp;as critical and strategic nodes and hubs of energy and resilience, it is without saying that a place-based policy which would&nbsp;prioritise&nbsp;the requests from a&nbsp;\u201cport area\u201d&nbsp;would&nbsp;probably be&nbsp;our&nbsp;favourite&nbsp;scenario, but we are not yet there. Moreover,&nbsp;the priority queue&nbsp;risks to&nbsp;be&nbsp;long as well.&nbsp;&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>If ports were to have a wish list for Christmas\u00a0last December,\u00a0I think that quite some ports would have had grid\u00a0connection and grid capacity\u00a0high\u00a0on their list.<\/p>\n","protected":false},"author":8,"featured_media":6024,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[46,1376,74],"tags":[176,2435,509,637,539,48,1895],"sponsor":[],"class_list":["post-6023","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy-technology-greenport","category-greenport-exclusive","category-insight-opinion-greenport","tag-espo","tag-grid-capacity","tag-isabelle-ryckbost","tag-port-electrification","tag-port-infrastructure","tag-shorepower-electrification","tag-wind-grid-connection"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/posts\/6023","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/comments?post=6023"}],"version-history":[{"count":1,"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/posts\/6023\/revisions"}],"predecessor-version":[{"id":6025,"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/posts\/6023\/revisions\/6025"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/media\/6024"}],"wp:attachment":[{"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/media?parent=6023"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/categories?post=6023"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/tags?post=6023"},{"taxonomy":"sponsor","embeddable":true,"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/sponsor?post=6023"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}