{"id":6111,"date":"2026-02-13T08:22:00","date_gmt":"2026-02-13T08:22:00","guid":{"rendered":"https:\/\/portstrategy.nfdtesting.uk\/greenport\/2026\/02\/13\/klaipda-green-h2-project-begins-testing\/"},"modified":"2026-08-27T14:21:04","modified_gmt":"2026-08-27T13:21:04","slug":"klaipda-green-h2-project-begins-testing","status":"publish","type":"post","link":"https:\/\/www.portstrategy.com\/greenport\/news\/alternative-fuels-greenport\/klaipda-green-h2-project-begins-testing\/","title":{"rendered":"Klaip\u0117da green H2 project begins testing"},"content":{"rendered":"<p>Testing at the Baltic Sea port will begin shortly as the facility prepares to commence operations later this year. In spring, the project will transition from construction to full commissioning.<\/p>\n<p><a href=\"https:\/\/www.portstrategy.com\/environment-and-sustainability\/work-begins-on-klaipdas-green-hydrogen-station\/1503979.article\" target=\"_blank\" rel=\"noopener noreferrer\"><span style=\"text-decoration: underline\"><strong>READ MORE: Work begins on&nbsp;Klaip\u0117da\u2019s green hydrogen station<\/strong><\/span><\/a><\/p>\n<p>\u201cEven though winter is in full swing, work on the green hydrogen station at the Port of Klaip\u0117da has not slowed down,\u201d said Algis Latakas, chief executive of the Klaip\u0117da State Seaport Authority.<\/p>\n<p>\u201cConstruction and equipment installation are close to completion, moving the project into the testing phase. This is a crucial stage of the project, and we are preparing for it very carefully.<\/p>\n<p>\u201cThis innovative initiative goes far beyond the port itself \u2013 it is a true breakthrough in building a clean hydrogen fuel economy in Lithuania.\u201d<\/p>\n<p>The green hydrogen production and refuelling station will use a polymer electrolyte membrane electrolyser to produce clean fuel. At full capacity, it is expected to generate around 127 tonnes of hydrogen annually. Part of this output will supply <a href=\"https:\/\/www.portstrategy.com\/environment-and-sustainability\/exclusive-lithuanias-hydrogen-powered-port-vessel\/1500752.article\" target=\"_blank\" rel=\"noopener noreferrer\">Lithuania\u2019s first green hydrogen-powered vessel<\/a>, which is nearing completion.<\/p>\n<p>The project is being implemented under the Economic Recovery and Resilience Plan Next Generation Lithuania, funded by the European Union\u2019s NextGenerationEU recovery and resilience facility.<\/p>\n<p>The total estimated cost of the hydrogen production and refuelling station stands at approximately \u20ac12 million, with around \u20ac6 million financed through EU funds.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Port of Klaip\u0117da has entered the testing phase of its green hydrogen project, with all equipment now installed at Lithuania\u2019s first green hydrogen production and refuelling station.<\/p>\n","protected":false},"author":8,"featured_media":6112,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[7,34],"tags":[40,36,1060,1805],"sponsor":[],"class_list":["post-6111","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-alternative-fuels-greenport","category-europe-greenport","tag-alternative-fuels","tag-green-hydrogen","tag-lithuania","tag-port-of-klaipeda"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/posts\/6111","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/comments?post=6111"}],"version-history":[{"count":1,"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/posts\/6111\/revisions"}],"predecessor-version":[{"id":6113,"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/posts\/6111\/revisions\/6113"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/media\/6112"}],"wp:attachment":[{"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/media?parent=6111"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/categories?post=6111"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/tags?post=6111"},{"taxonomy":"sponsor","embeddable":true,"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/sponsor?post=6111"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}