{"id":6392,"date":"2026-06-11T08:30:00","date_gmt":"2026-06-11T07:30:00","guid":{"rendered":"https:\/\/portstrategy.nfdtesting.uk\/greenport\/2026\/06\/11\/klaipda-accelerates-clean-transport-shift\/"},"modified":"2026-08-27T14:22:50","modified_gmt":"2026-08-27T13:22:50","slug":"klaipda-accelerates-clean-transport-shift","status":"publish","type":"post","link":"https:\/\/www.portstrategy.com\/greenport\/news\/alternative-fuels-greenport\/klaipda-accelerates-clean-transport-shift\/","title":{"rendered":"Klaip\u0117da accelerates clean transport shift"},"content":{"rendered":"<p>The new facility will supply hydrogen for passenger vehicles, heavy-duty transport, ships and port operations, strengthening the role of alternative fuels in Lithuania\u2019s energy transition.<\/p>\n<p>\u201cOnly a few years ago, green hydrogen at Klaip\u0117da Port was little more than an ambitious vision. It led us into unexplored territory, where we often found ourselves among the first to tackle challenges that had no clear solutions,\u201d&nbsp;said Algis Latakas, director general of Klaip\u0117da Port Authority.<\/p>\n<p>\u201dThe journey was demanding, but it gave us invaluable experience. Today, we are proud to open Lithuania\u2019s first green hydrogen facility and contribute to a new chapter in the country\u2019s energy transition. Klaip\u0117da Port has always connected sea and land routes; now it is also becoming a gateway to future energy solutions.\u201d<\/p>\n<p><strong>A new chapter<\/strong><\/p>\n<p>Development of the hydrogen facility began in 2023, with construction starting in summer 2025 and <a href=\"https:\/\/www.portstrategy.com\/environment-and-sustainability\/klaipda-green-h2-project-begins-testing\/1507998.article\" target=\"_blank\" rel=\"noopener noreferrer\">testing taking place in February 2026<\/a>.<\/p>\n<p>The station uses a polymer electrolyte membrane (PEM) electrolyser and is expected to produce around 127 tonnes of hydrogen annually at full capacity.<\/p>\n<p>Approximately one quarter of the hydrogen output will support Klaip\u0117da Port Authority\u2019s own operations. A hydrogen-powered waste collection vessel is due to enter service at the port, while a hydrogen-powered Toyota Mirai has already joined the Authority\u2019s vehicle fleet.<\/p>\n<p>Designed as open port infrastructure, the facility will also support the wider logistics and transport sector. Klaip\u0117da Port Authority is working with LTG Group, Klaip\u0117da Stevedoring Company BEGA and Volvo Lietuva to explore hydrogen applications in freight transport, rail operations and other port activities.<\/p>\n<p>The project was implemented under the Next Generation Lithuania Economic Recovery and Resilience Plan and funded through the European Union\u2019s NextGenerationEU programme. Total investment in the hydrogen production and refuelling station is estimated at \u20ac12 million, including approximately \u20ac6 million in EU funding.<\/p>\n<p>Commercial hydrogen supply is scheduled to begin in autumn 2026.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Klaip\u0117da Port has opened Lithuania\u2019s first green hydrogen production and refuelling station, supporting the development of low emission transport and sustainable port infrastructure.<\/p>\n","protected":false},"author":8,"featured_media":6393,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[7,34],"tags":[40,36,1944],"sponsor":[],"class_list":["post-6392","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-alternative-fuels-greenport","category-europe-greenport","tag-alternative-fuels","tag-green-hydrogen","tag-klaipeda-port"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/posts\/6392","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/comments?post=6392"}],"version-history":[{"count":1,"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/posts\/6392\/revisions"}],"predecessor-version":[{"id":6394,"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/posts\/6392\/revisions\/6394"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/media\/6393"}],"wp:attachment":[{"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/media?parent=6392"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/categories?post=6392"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/tags?post=6392"},{"taxonomy":"sponsor","embeddable":true,"href":"https:\/\/www.portstrategy.com\/greenport\/wp-json\/wp\/v2\/sponsor?post=6392"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}