..while import-export traffic declines
1,350m of quay will be dredged to 16m alongside, and an approach channel dredged to 14.5m. An additional 13 ship-to-shore gantry cranes will bring the total number in operation at the port to 38. An all-new North Rail Terminal, capable of removing annually up to 500,000 lorries off the roads, is included. The first phase […]