Ravenna to build new box terminal
A feasibility study undertaken on behalf of Ravenna Port Authority has shown that it would be both financially and technically possible to justify deepening the draught of the port to 14.5 metres.
A feasibility study undertaken on behalf of Ravenna Port Authority has shown that it would be both financially and technically possible to justify deepening the draught of the port to 14.5 metres.