Lisbon to expand Liscont

Lisbon Port Authority has conceded that it may knock down existing buildings in Alcantara Dock in order to double the operating area of Liscont Container Terminal, which is currently handling in the region of 320,000 teu/year.

00_95014_ps20060801_04

Lisbon Port Authority has conceded that it may knock down existing buildings in Alcantara Dock in order to double the operating area of Liscont Container Terminal, which is currently handling in the region of 320,000 teu/year.