NAVIS
Max Stable features an eight-rope reeving system without auxiliary ropes and a new angular sheave scheme that in combination stabilise the load allowing faster, more accurate positioning of the spreader,Kalmar claims.
Navis is to provide the Terminal Operating System at APM Terminals’ new Virginia terminal on the Elizabeth River in Portsmouth. The 291-acre greenfield site is the country’s largest, single private investment in container terminals and is expected to be completely developed in 2007. The terminal will set a new benchmark in the container handling industry, establishing new performance standards of operation. For example, the gate complex will have 24 lanes in Phase 1 with the capacity to expand to 32 lanes. The berth is designed to accept up to 12 quay cranes. A railhead will be built at the northwestern corner of the terminal with the ability to have 12 tracks if necessary.