Dredging re-commences at Cabedelo
The president of Brazils Paraiba Port Company has confirmed that dredging work to remove a large piece of rock from the access channel at the port of Cabedelo recommenced in February. Once concluded this will enable the port to guarantee a minimum of 10 metres of depth in the access channel allowing larger vessels to call.
The president of Brazils Paraiba Port Company has confirmed that dredging work to remove a large piece of rock from the access channel at the port of Cabedelo recommenced in February. Once concluded this will enable the port to guarantee a minimum of 10 metres of depth in the access channel allowing larger vessels to call.