RMGs at Gateway

DP World has increased rail capacity at London Gateway by 50 per cent by introducing two new Rail Mounted Gantry (RMG) cranes.

DP World has increased rail capacity at London Gateway by 50 per cent by introducing two new Rail Mounted Gantry (RMG) cranes. The total investment of £12 million (US$14.9 million) follows the operator confirming it has commenced construction of a fourth container berth at a cost of £350 million (US$433.4 million), which will increase terminal capacity by over 30 per cent when operations commence in 2024.