Rotterdam looks to speed up LNG ship loading

The Port of Rotterdam’s Gate Terminal is looking to increase LNG ship loading flow rate in order to lower port time for larger container vessels.

The work will allow Gate Terminal to load the new standard size vessels of around 180000 m3 in less than three days Photo: Port of Rotterdam

The Port of Rotterdam’s Gate Terminal is looking to increase LNG ship loading flow rate in order to lower port time for larger container vessels.