WATCH: Mobile shore power cuts cruise emissions

ShoreLink is delivering a CruiseLink Mobile S shore power solution to Port of Oslo in Norway with a view to cutting cruise emissions both at the port and in the local community.

The image shows the CruiseLink Mobile L Cable Management in operation at Ports of Stockholm

The installation is for the Filipstad cruise quay, which is a key maritime hub located directly in the heart of the city. It will play an important role in balancing efficient operations with the needs of an urban environment.

With Filipstad’s cruise activity taking place close to offices, residential areas and public spaces, reducing local noise and emissions is especially important for the people who live and work nearby.

Mobile solution

This is where ShoreLink’s CruiseLink Mobile S comes in. The solution is designed to be lighter, smarter and more agile than permanent installtions on the quayside.

The unit features a near-zero turning radius and a 55-metre cable reel operable from both sides. This makes it particularly well suited for city ports, enabling seamless integration without disrupting daily operations.

Shore power allows vessels to shut down their auxiliary engines while alongside and connect directly to the local grid supporting the port’s continued transition toward a more sustainable and environmentally responsible harbour.

ShoreLink announced the launch of CruiseLink Mobile S at the end of last year.

The Estonia-based shore power company said that the solution was developed with a sharper focus on cruise-sector electrification, offering ports and terminals a compact shore power system designed specifically for where space is at a premium.

CruiseLink Mobile S is built around a lightweight, self-propelled cable management unit that can be operated by a single person.

The system signals a shift in the company’s product strategy as it aims to address one of the main barriers to shorepower adoption in the cruise industry – the lack of available quay space for traditional fixed installations.

Back in 2024, cruise ferries at the Ports of Stockholm plugged into shorepower on the quayside for the first time, also courtesy of ShoreLink.