Protea cranes for Russian LNG terminal
Protea has recently delivered two new gantry cranes for installation at the Yamal Gas Terminal in northern Russia.
The design of the gantry cranes has been adapted for the LNG terminal, it uses high-grade steel and a number of innovative features to ensure reliable cooperation in the extreme environmental conditions.
“This project presented a number of novel technical challenges as the cranes have to work in very low temperatures (down to -50°C) in a Zone 1 hazardous area,” said Tomasz Poprawa, project manager.
He added: “By combining proven system elements and applying our in-house engineering expertise, we have delivered a unique solution that meets our customer’s challenging requirements.”
To improve the efficiency and safety of operations, operators can control the cranes from either a central control desk, a pendent control panel, or a radio control unit
The cranes also meet the latest Russian market certification requirements and have recently completed an extensive programme of factory testing at Protea’s state-of-the-art production facility in southern Poland.
They will now be shipped to Russia for installation and commissioning by Protea engineers.
“These cranes highlight both the wide range of high-quality lifting equipment we can supply, including pedestal cranes, BOP handling cranes, cargo cranes, heavy lift cranes and windfarm platform cranes, and how we can deliver unique solutions for specific applications” concluded Tomasz Paszkiewicz, Protea CEO.