Tianjin returns to PSA for expansion joint venture

Tianjin Port Authority has given its goahead for a third phase expansion of its container terminal at a cost of $840m. The project is being taken forward by Tianjin Port Pacific International Container Terminal, which is a joint-venture between PSA China (49%) and Tianjin Port Group (51%). It involves construction of six berths capable of receiving 10,000 teu vessels. 

Tianjin Port Authority has given its goahead for a third phase expansion of its container terminal at a cost of $840m. The project is being taken forward by Tianjin Port Pacific International Container Terminal, which is a joint-venture between PSA China (49%) and Tianjin Port Group (51%). It involves construction of six berths capable of receiving 10,000 teu vessels.