CALCUTTA/HALDIA TO BUILD NEW MULTIPURPOSE BERTH
Haldia Dock Complex (HDC) is to build a new multipurpose berth inside the dock system. To be known as the Number Two berth, this will bring the number of berths within the dock system to 13. In addition there are a further three berths on the riverfront, all of which are oil jetties, but these are outside the dock system.
Haldia Dock Complex (HDC) is to build a new multipurpose berth inside the dock system. To be known as the Number Two berth, this will bring the number of berths within the dock system to 13. In addition there are a further three berths on the riverfront, all of which are oil jetties, but these are outside the dock system.