Long Beach commissions shoreside power terminal
Launching a new, “green” era in shipping at the Port of Long Beach, the “K” Line container vessel Long Beach Bridge on Tuesday, November 11, 2008, became the Port’s first ship to plug in to clean electrical power and shut down its diesel engines at berth for major air quality improvements.
Launching a new, “green” era in shipping at the Port of Long Beach, the “K” Line container vessel Long Beach Bridge on Tuesday, November 11, 2008, became the Port’s first ship to plug in to clean electrical power and shut down its diesel engines at berth for major air quality improvements.